This was an exploratory remediation project, as the full extent of mold penetration and structural impact was unknown prior to work commencing. During investigation, significant deterioration was discovered in a load-bearing wall. It was determined that the lower 18 inches of the wall and one floor joist required removal and replacement. To safely complete the work, an engineered shoring plan was developed and implemented by CI. Once shoring was in place, the compromised sections of the load-bearing wall and floor system were carefully removed, remediated, and rebuilt to restore both structural integrity and safe working conditions.